Performance |
Loader lifting capacity |
5000KG |
Operating weight |
16500KG |
|
Rated bucket capacity |
3m³ |
|
Max. tractive force |
167KN |
|
Max. breakout force |
≥177KN |
|
Max. grade ability |
30° |
|
Max. dump height |
3100mm |
|
Max. dump reach |
1250mm |
|
Overall dimension(L×W×H) |
8108×2950×3450mm |
|
Min. turning radius |
6640mm |
|
Engine |
Model |
Weichai |
Type |
lnline, water cooled, four stroke |
|
Cylinder-Inner diameter*stroke |
6-126×130mm |
|
Rated power |
162kw |
|
Max. torque |
980N.m |
|
Min fuel consumption |
≤213g/kw.h |
|
Transmission system |
Torque converter |
YJSW315 |
Gearbox mode |
planetary |
|
Gears |
2 forward and 1 reverse gears |
|
Max. speed |
38km/h |
|
Drive axles |
Wheel base |
3250mm |
Wheel tread |
2250mm |
|
Ground clearance |
450mm |
|
hydraulic system |
System working pressure |
18Mpa |
Boom lifting time |
5.95±0.2s |
|
Total time |
10.95±0.5s |
|
Fuel tank capacity |
249L |
|
Self-levelling bucket |
yes |
|
Brake system |
Service brake |
Air assist disc brake on 4 wheels |
Parking brake |
Manual brake |
|
Tyre |
Tyre model |
23.5-25 |
Front tyre pressure |
0.4Mpa |
|
Rear tyre pressure |
0.35Mpa |
● Heavy duty frame, double tapered roller bearing hinged, high load capacity.
● Enhanced drive axle for higher reliability.
● Efficient connecting rod mechanism, large lifting force, optimized bucket, durable.
● Independent cooling system, can adapt to the environment temperature 55℃ normal operation.
● New generation body, luxury cab, new hood, large space, heating and cooling air conditioning, with defrost function, more comfortable.
FAQ:
How do your prices compare to manufacturers/factories?
We are the leading dealer of major leading construction machinery manufacturers/factories in China, and always provide the best dealer prices.
From multiple comparisons and feedback from customers, our prices are more competitive than those of manufacturers/factories.
How is your delivery time?
Generally, we can deliver regular machines to customers immediately within 7 days, because we have multiple resources to check the stock machines locally and nationwide, and receive the machines in time.
But for manufacturers/factories, it takes more than 30 days to produce the ordered machines.
How soon can you respond to customer inquiries?
Our team consists of a group of hardworking and energetic people, working around the clock to respond to customer inquiries and questions at any time.
Most issues can be resolved within 8 hours, while manufacturers/factories take longer to respond.
What payment terms can you accept?
Usually we can adopt T/T or L/C terms, and sometimes DP terms.
(1)Under T/T terms, a 30% deposit is required and the 70% balance should be settled before shipment or against a copy of the original bill of lading for long-term customers.
(2) Under L/C terms, a 100% irrevocable letter of credit with no "soft terms" from an internationally recognized bank is acceptable.