All Categories
Home> XCMG

XCMG XDR90TA Dump Truck

  • Introduction
Introduction
Product model Product model
Rated power 570/1900 kW/rpm
Working weight of the whole machine 121000kg
Rated load 81000kg
Cargo box volume (SAE 2:1 stacking) 52m³
Maximum speed: 37km/h

Product Introduction:
The frame of the XDR90TA dump truck is composed of parallel left and right longitudinal beams and cross beams, which together form a closed structure. The longitudinal beam is a box-section structure, and the cross beam is a torsion-resistant tube structure, which can eliminate the stress concentration source of bending and cracking.

The whole machine adopts a full oil-gas suspension system. The oil-gas suspension is articulated with the frame and the front and rear axles through joint bearings, and the exposed part of the piston rod is protected by a retractable sheath.

Full hydraulic power steering, smooth steering, high response accuracy, equipped with a double pump + electric emergency steering system to avoid safety hazards and solve the problem of being unable to tow when the engine fails.

The cab has a spacious space and a wide field of vision. Various display instruments, alarms, lighting, control switches, radios, etc. are fully equipped.

FAQ:
How do your prices compare to manufacturers/factories?
We are the leading dealer of major leading construction machinery manufacturers/factories in China, and always provide the best dealer prices.
From multiple comparisons and feedback from customers, our prices are more competitive than those of manufacturers/factories.

How is your delivery time?
Generally, we can deliver regular machines to customers immediately within 7 days, because we have multiple resources to check the stock machines locally and nationwide, and receive the machines in time.
But for manufacturers/factories, it takes more than 30 days to produce the ordered machines.

How soon can you respond to customer inquiries?
Our team consists of a group of hardworking and energetic people, working around the clock to respond to customer inquiries and questions at any time.
Most issues can be resolved within 8 hours, while manufacturers/factories take longer to respond.

What payment terms can you accept?
Usually we can adopt T/T or L/C terms, and sometimes DP terms.
(1)Under T/T terms, a 30% deposit is required and the 70% balance should be settled before shipment or against a copy of the original bill of lading for long-term customers.
(2) Under L/C terms, a 100% irrevocable letter of credit with no "soft terms" from an internationally recognized bank is acceptable.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000

RELATED PRODUCT

WeChat WeChat
WeChat
TopTop Whatsapp Whatsapp