Parameters | unit | XSL3/160 | |
Drilling capability | Drilling depth | m | 300(89) |
Large through diameter | mm | 254 | |
Feed system | Large lifting force | kn | 160 |
Large feed force | kn | 80 | |
Fast lifting speed | m/min | 32 | |
Fast lowering speed | m/min | 60 | |
Stroke | mm | 3800(7000) | |
Top drive head | Large torque | n.m | 6600/3300 |
Onboard engine | |||
Main winch | |||
High speed | r/min | 95/190 | |
Spindle diameter | mm | 45 | |
Spindle floating stroke | mm | / | |
Large tilting height | ° | / | |
Tool winch | Model | / | YUCHAI YC4A125-T30 |
Shackle device | |||
Rated power | kw | 92 | |
Top drive head | Large lifting force | kn | / |
Large lifting force | kn | 15 | |
Onboard engine | Large shackle torque | n.m | 18000 |
Clamping range | mm | custom made |
1. XCMG XSL3/160 Water Well Drilling Rig adopts Yuchai III stage engine. Electronically controlled fuel injection, lower fuel consumption and more environmentally friendly; electronic control technology is used to effectively reduce the phenomenon of wandering, turning around and white smoke; the engine fault code can be automatically displayed for easy maintenance.
2. Mature and reliable hydraulic top drive power head. The main shaft adopts large-load bearing bearings, and the drilling accuracy is higher; the main shaft seal adopts a multi-group sealing design to ensure the sealing effect; the gas tap adopts the company's proprietary sealing technology and has a long service life.
3. Roller sliding telescopic drilling mast. Forklift C-shaped steel is used, with stable structure and high strength; the power head and the inner section of the drilling mast, and the inner section of the drilling mast and the outer section of the drilling mast all adopt roller sliding, with less wear and high drilling accuracy.
4. XCMG XSL3/160 Water Well Drilling Rig's unique hydraulic matching technology. Multi-pump confluence and diversion technology minimizes system heating and fuel consumption; integrated fine feed system has low pressure loss and can accurately adjust drilling pressure according to the weight of the drilling tool in the hole;
5. Safe and considerate detail design. Emergency stop buttons are set in multiple places to ensure the safety of the machine and personnel; folding foot pedals are easy to operate.
6. Super value appreciation space. Optional drill rod box is convenient for ground source heat pump construction; optional foam pump can effectively reduce environmental pollution and improve slag discharge performance.
FAQ:
How do your prices compare to manufacturers/factories?
We are the leading dealer of major leading construction machinery manufacturers/factories in China, and always provide the best dealer prices.
From multiple comparisons and feedback from customers, our prices are more competitive than those of manufacturers/factories.
How is your delivery time?
Generally, we can deliver regular machines to customers immediately within 7 days, because we have multiple resources to check the stock machines locally and nationwide, and receive the machines in time.
But for manufacturers/factories, it takes more than 30 days to produce the ordered machines.
How soon can you respond to customer inquiries?
Our team consists of a group of hardworking and energetic people, working around the clock to respond to customer inquiries and questions at any time.
Most issues can be resolved within 8 hours, while manufacturers/factories take longer to respond.
What payment terms can you accept?
Usually we can adopt T/T or L/C terms, and sometimes DP terms.
(1)Under T/T terms, a 30% deposit is required and the 70% balance should be settled before shipment or against a copy of the original bill of lading for long-term customers.
(2) Under L/C terms, a 100% irrevocable letter of credit with no "soft terms" from an internationally recognized bank is acceptable.